Abuja residents have been notified of a planned 15-day power outage starting Monday, January 6 to 20, 2025.
The post Abuja residents to face 15-day power outage from Jan 6 – TCN appeared first on Nairametrics.
Abuja residents have been notified of a planned 15-day power outage starting Monday, January 6 to 20, 2025.
The post Abuja residents to face 15-day power outage from Jan 6 – TCN appeared first on Nairametrics.
Share via: